Remodeling · Burlington, Vermont

Kitchens and baths, built right the first time.

A small crew that remodels kitchens, bathrooms and the odd addition around Chittenden County. One project lead from first visit to final walk-through, and a written price before demo day.

Finished kitchen with white cabinets, a granite-topped island and tile floor
Sample project: kitchen and dining opened up
  • Licensed and insured in Vermont
  • Lead-safe certified for older homes
  • 2-year workmanship warranty
  • Fixed price, written before we start

How a remodel goes

Three steps, no mystery. Most kitchens take 5 to 8 weeks once work starts.

  1. Free walk-through

    We come out, measure, listen and talk budget honestly. About an hour.

  2. Written fixed price

    Within a week you get drawings, a materials list and one number. No allowances that balloon later.

  3. Build and hand over

    Weekly updates from your project lead, a clean site every night, and a walk-through punch list at the end.

Book a walk-through

Before, after and what it cost

Three recent jobs, with the real numbers. Your house will differ, but this is the honest ballpark.

See all six projects
Sleek kitchen with glossy white cabinets, a long counter and a wood breakfast bar
Kitchen · condo

Dark galley to bright open kitchen

Before
Closed galley, 1980s oak, one outlet per wall
After
Wall opened, flat-panel cabinets, breakfast bar, under-cabinet light
7 weeks$48k to $55k
White subway-tiled bathtub surround with a navy tile stripe and black fixtures
Bathroom · family home

Hall bath, down to the studs

Before
Leaky tub, soft subfloor, no fan
After
New subfloor, tiled tub surround, niche, quiet vent fan
3 weeks$19k to $24k
Craftsman fastening a new window frame with a cordless drill
Windows · older home

Drafty 1920s windows replaced, trim saved

Before
Single-pane sashes, rattling all winter
After
Eight insulated windows, original trim stripped and reinstalled
2 weeks$14k to $17k

What projects usually cost

Ranges from our last two years of work, materials and labor included. Your walk-through gets you a fixed number.

Bathroom refresh

$12k to $20k

New fixtures, tile, vanity. 2 to 3 weeks.

Full bathroom

$20k to $35k

Down to the studs. 3 to 5 weeks.

Kitchen remodel

$40k to $85k

Cabinets, counters, layout changes. 5 to 8 weeks.

Small addition

From $95k

Mudroom, sunroom or bedroom. 3 to 5 months.

Get a quote for your project

Where we work

Burlington and about 25 minutes around it. Our shop is just outside town, so we're never far when a question comes up.

  • Burlington
  • South Burlington
  • Winooski
  • Essex
  • Williston
  • Shelburne
  • Colchester
  • Charlotte
Hand marking a board with a pencil against a yellow tape measure

Thinking about a remodel?

Tell us about it in two minutes. We call back within two business days to book a walk-through.

Get a quote